Efficient And Best Accurate




Detailed description

14 day extended toxicity test report on fish

Detection standard

  • Detection specification

Which testing institution is better to find for the 14 day extended toxicity test report of fish? The Hundred Inspection Test can provide you with a 14 day extended toxicity test service for various fish species. Detection cycle: 15 to 30 working days to issue a 14 day extended toxicity test report for fish. Testing fee: Free initial testing, quoted based on customer testing needs and experimental complexity. Fish Toxicity Test Standard (Part) GB/T 16310.1-1996&Nbsp; Code for hazard assessment of liquid chemicals transported in bulk by ships - Acute toxicity test method for aquatic organisms (GB/T 21807-2008)&Nbsp; Chemicals - Short term toxicity tests for embryonic and yolk sac larvae of fish GB/T 21814-2008&Nbsp; Test methods for industrial wastewater - Acute toxicity test for fish (GB/T 21854-2008)&Nbsp; Chemicals - Toxicity tests for early life stages of fish (GB/T 23186-2009)&Nbsp; Regulations for Chronic Toxicity Testing of Aquatic Feed Safety Evaluation GB/T 27861-2011&Nbsp; Chemicals - Acute toxicity test for fish GB/T 31270.12-2014&Nbsp; Guidelines for Environmental Safety Assessment of Chemical Pesticides - Part 12: Acute Toxicity Testing of Fish (GB/T 35517-2017)&Nbsp; Chemicals - Short term test method for fish reproductive toxicity NY/T 3152.4-2017&Nbsp; Guidelines for Environmental Risk Assessment of Microbial Pesticides - Part 4: Fish Toxicity Test SN/T 3946-2014&Nbsp; Chemical Acute Fish Toxicity Test Threshold Method: Fish 14 Day Extended Toxicity Test Process 1. Sample Sending 2. Free Initial Inspection 3. Quotation 4. Both parties confirm and sign a confidentiality agreement to start the experiment 5. Complete the experiment: The testing cycle may vary depending on the sample and its testing items/methods. Consulting engineers 6. Issue a testing report for later services. The above is an introduction to the 14 day extended toxicity test for fish (the test/detection cycle, methods, and steps are specific to the engineer. If the sample is special, we can communicate with the engineer to design a reasonable testing and analysis plan for you, saving your time)

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

100% inspection and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China


TEL:400-101-7153       EMAIL:service@Baijiantest.com      ADD:No. 700, Yishan Road, Xuhui District, Shanghai

Copyright © 2021-2022 Shanghai Baijian Co., Ltd. All Rights Reserved.   www.zhijiantest.com   BAIJIAN sitemap


seo seo