Efficient And Best Accurate




Detailed description

Reflective insulation test

Detection standard

  • Detection specification

Where can I go to get a complete solution for reflective insulation testing? BAIJIAN Materials Testing Agency provides reflective insulation testing services. It is a national high-tech enterprise, a third-party materials laboratory, and a CMA qualification certification agency. It is a collectively owned scientific research institution with complete laboratory instruments. , a strong scientific research team, adhering to the concept of scientific research and dedication, engaged in performance testing, non-standard testing, unknown substance detection and identification, industrial problem diagnosis and testing, composition testing, failure detection, corrosion testing, etc. Test reports will be issued in 7-15 working days to support The QR code system checks authenticity, and multiple laboratory branches across the country support nationwide door-to-door sampling/sample delivery testing services.

Test period: 7-15 working days

Testing fee: Initial inspection of samples. After the initial inspection, a quotation will be made based on the customer's testing needs and the complexity of the experiment.

Reflective insulation test range

Architectural coatings, solar film, automotive topcoat, aluminum foil, paint, fluorocarbon paint, ceramic hollow microspheres, water-based paint, glass, real stone paint, Aerogel etc.

Test item: Reflective insulation test

What is the role of the BAIJIAN test report? It can help you solve it What questions?

1. Sales report. (Sales need to provide third-party testing reports to make their products more unique, let the product data speak for themselves, and make customers more confident in the quality of their products.)

2. Research and development reports. (In the process of developing new products, we encountered some thorny issues about ingredients. We used third-party testing data to find the cause of the problem, solve the problem in a timely manner, shorten the R&D cycle, and reduce R&D costs)

3. Improve products quality. (Discover problems with your own products through comparison of third-party testing data, improve product problems, improve quality, and reduce production costs)

4. Use of scientific research paper data.

Reflective insulation test standards

HG/T 4341-2012 Heat reflective insulation coatings for metal surfaces

JGJ/T 287-2014 Building reflective insulation Energy-saving testing standards for coatings

GB/T 25261-2010 Reflective insulation coatings for buildings

JG/T 235-2008 Reflective insulation coatings for buildings

JG/ T 235-2014 Reflective and thermal insulation coatings for buildings

GB/T 25261-2018 Reflective and thermal insulation coatings for buildings

JC/T 1040-2007 Heat-reflective and thermal insulation coatings for building exterior surfaces

DB34/T 1505-2011 Technical Regulations for the Application of Reflective Insulating Coatings in Buildings

JGJ/T 359-2015 Technical Regulations for the Application of Reflective Insulating Coatings in Buildings

DB31/T 895 -2015 Technical Regulations for the Application of Reflective Insulating Coatings Combined with Desulfurized Gypsum Lightweight Aggregate Mortar Insulation System

What are the advantages of BAIJIAN material testing laboratory?

1. Collectively owned testing institution with complete qualifications , The test report is scientific, fair and accurate.

2. Multiple laboratory branches are located across the country, supporting door-to-door sampling/sending samples for testing.

3. The testing cycle is short, the testing cost is low, and the experimental plan is more complete.

4. For initial inspection of samples, no testing fees will be charged during the initial inspection.

5. The test report supports scanning the QR code to check the authenticity.

BAIJIAN testing process

1. Send samples. (Communicate with engineers, submit your own testing requirements and send samples to our research institute)

2. Initial inspection samples. (After receiving the sample, conduct a preliminary inspection of the sample and formulate a detailed experimental plan)

3. Quotation. (After the initial inspection, a quotation will be made based on the customer's testing needs and the complexity of the experiment)

4. Both parties confirm, sign a confidentiality agreement, and start the experiment.

5. It takes 7-15 working days to complete the experiment.

6. Mail the test report and provide post-service.

The above is the relevant introduction to the reflective insulation test. If you have other needs, you can consult the laboratory engineer to help you solve it.

Previous post:Flashover test Next chapter:


TEL:400-101-7153       EMAIL:service@Baijiantest.com      ADD:No. 700, Yishan Road, Xuhui District, Shanghai

Copyright © 2021-2022 Shanghai Baijian Co., Ltd. All Rights Reserved.   www.zhijiantest.com   BAIJIAN sitemap


seo seo