|
Where to go for pull-out testing? Where to go for pull-out testing reports? BAIJIAN material testing institutions can provide paper product testing services, formal scientific research analysis and testing institutions, high-tech enterprises, CMA qualification certification institutions, third-party material laboratories, 7 -The test report can be issued within 1 working day, and the authenticity can be checked by scanning the QR code. The testing equipment is complete, the scientific research team is strong, and door-to-door sampling and sample delivery testing services are supported. Detection cycle: 7-15 working days Testing fee: Initial inspection of samples. After the initial inspection, a quotation will be made based on the customer's testing needs and the complexity of the experiment. Pulling detection rangeSteel bars, heavy-duty railway spiral spikes, embedded steel wires, decorative tiles, clamps, split planted bars, carbon fiber, prefabricated piles, flat head self-tapping anchors Bolts, steel bar clamping equipment, ball cages, anchors, planting bars, anchor bolts, bearings, soil nails, exterior wall bricks, steel wires, ceramic tiles, construction engineering anchors, curved end anti-floating anchors, exterior wall insulation System anchor bolts and insulation boards, rear embedded parts, special expansion bolts for ceilings, touch screens, plugs, plastic parts, road studs, fabrics, screw sleeves, concrete, anchors, etc. Pull-out test itemsPull-out test, pull-out load test, pull-out force test, pull-out resistance test, pull-out strength test, pull-out resistance test, in-situ Drawing inspection, drawing tooling inspection, drawing on-demand inspection, on-site drawing inspection, door-to-door drawing inspection, etc. (If you have other needs, you can directly contact the laboratory engineer to answer your questions.) BAIJIAN third-party testing report is available What functions? What problems can it help you solve?1. Sales and use. (Sell your own products and issue third-party testing reports to make customers more confident in the quality of your products) 2. R&D and use. (During the research and development process, some difficult problems are encountered, and the problems are solved through test report data, thereby shortening the research and development cycle and reducing research and development costs) 3. Improve product quality. (By comparing test data, you can discover your own product problems, improve product quality, and reduce production costs) 4. Simulate production. (Through the formula testing service, we can test the best products in the same industry and realize simulated production) 5. Use of scientific research paper data. 6. Bidding and bidding (BAIJIAN has a relatively short testing cycle, low testing costs, and high recognition, and is especially suitable for bidding) PullPullout test standardGB/T 15820-1995 Pullout resistance test for connections between polyethylene pressure pipes and fittings GB/T 30100-2013 Test method for building wall panels YB/T 4730-2019 Technical requirements for pickling-free drawing pretreatment of steel wire DG/TJ 08-003-2000 Test method for pull-out and shear resistance of building anchors T/GDCKCJH 042-2021 Performance requirements and testing methods for facing tile pullout instrument ASTM D6706-2001 (2007) Test method for measuring the pullout force of geosynthetic materials in soil ASTM F459-2006 Test method for measuring the drawing strength of microelectronic wire jointsBS 2897-1970 (R2008) Forged aluminum for electrical purposes. Strips with drawn or rolled edges BS EN 2591-610-2001 Test methods for optoelectronic connecting components Part 610: Effects of optical component cable attachment on cable pullout ASTM D6706-2001 (2007) Measurement of geosynthetic pullout in soil Test method for force ASTM F459-2006 Test method for measuring the pull-out strength of microelectronic wire joints BS 2897-1970 Forged aluminum for electrical applications. With drawn or rolled edges Strip BS EN 754-4-2008 Aluminum and aluminum alloys. Forged products. Cold drawn bars and tubes. Part 4: Drawn square bars. Dimensional and shape tolerances BS EN 2591-610-2001 Test methods for optoelectronic connecting components Part 610: Effects of cable attachment to optical components Cable drawingBS EN 10016-1-1995 Non-woven fabrics for drawing and/or cold rolling Alloy steel rods. General requirements BS EN 13602-2002 Copper and copper alloys Drawn copper round conductors for use in the manufacture of electrical conductors BS EN 13603-2002 Copper and copper alloys for evaluation Electrical purposes Tin coating with drawn round copper wire DIN EN 12399-1996 Examination of concrete. Determination of pull-out force ISO 4101-1983 Specification for drawn wire for elevator wire ropes< /p> JIS C62137-1-1-2010 Surface mount technology Surface mount welds - Environmental and durability test methods Part 1-1: Pullout strength test JIS H4554-1999 Nickel and nickel alloy wire and drawing materials NF G52-005-2007 Leather Determination of tensile strength of leather (thin skin test) NF EN 754-8-2008 Aluminum and aluminum Alloys. Cold drawn rods/strips and tubesMaterials. Part 8: Dimensional and shape tolerances for porous drawn tubes NF EN 10016-2-1995 Non-alloy steel wire rods for drawn and/or cold rolled. Part 2: General purposes Special provisions for wire rods NF EN 10270-1-2001 Steel wire for mechanical springs. Part 1: Lead-quenched cold drawn non-alloy spring steel wire What are the advantages of BAIJIAN testing? Why Want to choose BAIJIAN?1. BAIJIAN is a collective ownership testing organization. 2. Initial inspection samples. 3. Multiple laboratory branches across the country support door-to-door sampling/send sample testing. 4. The testing cycle is short, the testing cost is low, and the experimental plan is complete. 5. Complete qualifications, complete laboratory equipment, and a strong scientific research team. 6. Support MSDS writing service in 36 languages BAIJIAN sample sending and testing process1. Sample sending 2. Initial inspection Sample 3. Quotation 4. Both parties confirm, sign a confidentiality agreement, and start the experiment 5. Complete the experiment in 7-15 working days 6. Issue test reports and provide follow-up services. The above is the relevant introduction to pull-out testing. If you have other testing needs, you can consult the laboratory engineer to help you answer them.
Previous post:Grafting rate detection
Next chapter:
|