Efficient And Best Accurate




Detailed content

Third-party processing process for domestic boiler energy efficiency testing report

Domestic boiler energy efficiency testing needs to be carried out according to the specified items and methods in the standards, GB national standards, industry standards, external standards, enterprise standards, and local standards. What are the energy efficiency testing projects and standards for domestic boilers? BAIJIAN third-party testing agency provides one-stop service for energy efficiency testing of domestic boilers. Engineers provide one-on-one service, confirm needs, recommend solutions, send samples for inspection, issue reports, and after-sales service, 3- The report will be issued in 15 working days. Welcome to consult. The energy efficiency testing cycle of domestic boilers is 3-15 working days. It can be expedited (except for special projects). Welcome to consult.

Test report: Domestic boiler energy efficiency testing

Testing fee: Negotiable by phone

Testing cycle: Normally 3-15 working days, except for special circumstances.

Reporting qualifications: CMA, CNAS, etc.

Report format: Chinese and English, paper version, electronic version.

Domestic boiler energy efficiency testing items:

Testing items:

Feed water flow, surface temperature, flue gas flow, slag carbon content, electric boiler power consumption , steam pressure, flue gas composition, gas flow, coal calorific value, air coefficient, coal consumption, thermal efficiency

Domestic boiler energy efficiency testing standards:

Testing standards

1. GB/T 10820-2011 Thermal Effect and Thermal Test Methods of Domestic Boilers

Baichan Testing Process:

1. Baiqian Customer Service Confirms Testing Requirements (Sample , projects, reporting purposes, etc.)

2. Arrange corresponding engineer docking services.

3. Confirm the quotation, sign the contract, and arrange to send samples for testing.

4. The laboratory receives the samples and starts testing according to demand.

5. Complete the test and issue a test report.

6. After-sales service.

What is the use of the test report?

1. Enter e-commerce platforms such as Tmall and JD.com.

2. Enter a large supermarket or store.

3. Bidding.

4. Project acceptance.

5. Publicity reports.

6. Supplier requirements.

For detailed information about the inspection, you can contact Baiqian customer service first, and the corresponding engineer will be arranged to connect with you later. Baikan third-party testing agency welcomes your consultation and looks forward to cooperating with you.


TEL:400-101-7153       EMAIL:service@Baijiantest.com      ADD:No. 700, Yishan Road, Xuhui District, Shanghai

Copyright © 2021-2022 Shanghai Baijian Co., Ltd. All Rights Reserved.   www.zhijiantest.com   BAIJIAN sitemap


seo seo