DC electronic ballast testing for public transportation vehicles lightingHow to apply for a report? What items need to be tested? We will conduct testing and evaluation in strict accordance with the standards. We can also provide personalized testing plans and reports according to your needs.
List of test items:
Dielectric strength, protective grounding device, terminal block, fault state, marking, creepage distance and electrical clearance, structure, heat resistance test of winding, heat resistance, fire resistance and leakage tracking resistance, screws, current-carrying parts and connectors, measures to prevent accidental contact with live parts, moisture-proof and insulation, abnormal state, heat resistance, fire resistance and leakage tracking resistance, pulse voltage, measures to prevent accidental contact with live parts, all parameters, all items, heat resistance, fire resistance and leakage tracking resistance
Summary of test standards:
1. GB 19510.6-200518 Creepage distance and electrical clearance
2. GB 19510.6-200519 Screws, current-carrying parts and connectors
3. GB19510.6-2005 Lamp control devices Part 6: Special requirements for DC electronic ballasts for public transportation vehicles lighting
4. IEC 61347-2-5:2000 Lamp control device Part 2-5: Special requirements for DC electronic ballasts for lighting of public transportation vehicles
5. GB 19510.6-200510 Protective earthing device
6. GB 19510.6-200511 Moisture resistance and insulation
7. IEC61347-2-5:2000 Lamp control device Part 2-5: Special requirements for DC electronic ballasts for lighting of public transportation vehicles
8. GB 19510.6-200512 Dielectric strength
9. GB19510.6-2005IEC61347-2-5:2000EN61347-2-5:2001 All parameters
10. GB 19510.6-200514 Pulse voltage
11. GB 19510.6-200515 Abnormal state
12. GB 19510.6-200516 Fault state
13. GB 19510.6-200517 Structure
14. GB 19510.6: 2005 IEC 61347-2-5: 2000 EN 61347-2-5: 2001 BS EN 61347-2-5: 2001 MS IEC 61347-2-5: 2003 Lamp control devices. Part 6: Particular requirements for DC electronic ballasts for lighting of public transportation vehicles
15. GB 19510.6-2005 Lamp control devices Part 6: Particular requirements for DC electronic ballasts for lighting of public transportation vehicles 12
16. GB 19510.6-20058 Measures to prevent accidental contact with live parts
17. GB 19510.6-20057 Marking
18. GB 19510.6-2005, IEC 61347-2-5:2000 Lamp control gear Part 6: Particular requirements for DC electronic ballasts for lighting of public transportation vehicles
19. GB 19510.6-200520 Heat resistance, fire resistance and tracking resistance
20. GB 19510.6-2005 IEC 61347-2-5:2000 EN 61347-2-5:2001 AS/NZS 61347.2.5:2002 Lamp control gear Part 6: Particular requirements for DC electronic ballasts for lighting of public transportation vehicles GB 19510.6-2005 IEC 61347-2-5:2000 EN 61347-2-5:2001 AS/NZS 61347.2.5:2002
Function of testing report:
1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report
2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms
3. Used as a sales report: issuing legally effective testing reports to make consumers more confident
4. Papers and research: Provide professional personalized testing needs
5. Judicial services: providing scientific, fair, and accurate testing data
6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems
inspection and testing process:
1. Telephone communication and confirmation of requirements
2. Recommend solutions and confirm quotations
3. Mail samples and arrange testing
4. Progress tracking and result feedback
5. Provide reports and after-sales service
6. If urgent or priority processing is required
Testing and testing characteristics:
1.The testing industry is fully covered, meeting different testing needs
2. Fully cover the laboratory and allocate localized testing nearby
3. Engineers provide one-on-one services to make testing more accurate
4. Free initial testing, with no testing fees charged
5. Self service order delivery for free on-site sampling
6. Short cycle, low cost, and attentive service
7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc
8. The testing report is authoritative and effective, and is generally used in China
Test report function
1、Project bidding: issue authoritative third-party CMA/CNAS qualification report;
2、E-commerce platform entry: quality inspection reports recognized by major e-commerce platforms;
3、Used as sales report: issuing a test report with legal effect to make consumers feel more at ease;
4、Papers and scientific research: providing professional and personalized testing needs;
5、Judicial services: providing scientific, fair and accurate testing data;
6、Industrial problem diagnosis: verifying the troubleshooting and correction of problems in industrial production;