Efficient And Best Accurate




Detailed description

Correction factor test

Detection standard

  • Detection specification

Where can I go to get a complete solution for correction coefficient testing? BAIJIAN Materials Testing Agency provides correction coefficient testing services. It is a national high-tech enterprise, a third-party materials laboratory, and a CMA qualification certification agency. It is a collectively owned scientific research institution with complete laboratory instruments and scientific research. The team is strong, adhering to the concept of scientific research and dedication, and is engaged in performance testing, non-standard testing, unknown substance detection and identification, industrial problem diagnosis and testing, composition testing, failure testing, corrosion testing, etc. Test reports will be issued in 7-15 working days, supporting 2D The code system checks the authenticity, and multiple laboratory branches across the country support door-to-door sampling/sample delivery testing services nationwide.

Test period: 7-15 working days

Testing fee: Initial inspection of samples. After the initial inspection, a quotation will be made based on the customer's testing needs and the complexity of the experiment.

Correction coefficient test range

Protective hot plates, internal combustion engines, batteries, fly ash, three-phase motors, engines, copper columns, leaf springs, asphalt pavements, etc.

Correction coefficient test items

Deflection correction coefficient test, temperature correction coefficient test, current correction coefficient test, stiffness correction coefficient test, average stress correction coefficient test, thickness correction coefficient test, Flow correction coefficient test, etc.

What does the BAIJIAN test report do? What problems can it help you solve?

1. Sales report. (Sales need to provide third-party testing reports to make their products more unique, let the product data speak for themselves, and make customers more confident in the quality of their products.)

2. Research and development reports. (In the process of developing new products, we encountered some thorny issues about ingredients. We used third-party testing data to find the cause of the problem, solve the problem in a timely manner, shorten the R&D cycle, and reduce R&D costs)

3. Improve products quality. (Discover problems with your own products through comparison of third-party testing data, improve product problems, improve quality, and reduce production costs)

4. Use of scientific research paper data.

Correction coefficient test standard

UNE 68-028-1986 Power test of agricultural tractor power take-off Correction coefficient

GJB 3196.39A-2005 Gun and ammunition test method Part 39: Test of correction coefficient of charge temperature on speed

GJB 3196.40A-2005 Gun and bullet test method Part 40: Charge Correction coefficient test of temperature vs. bore pressure

AGMA 93FTM5-1993 uses the tooth tip correction coefficient to carry out etc.Gear Optimization Design of Strength Gear Teeth

ISO 281:1990/Amd 2:2000 Rolling Bearing Rated Dynamic Load and Rated Life Modification 2: Life Correction Coefficient axyz

BAIJIAN Material Testing Laboratory has What are the advantages?

1. A collectively owned testing institution with complete qualifications and scientific, fair and accurate test reports.

2. Multiple laboratory branches are located across the country, supporting door-to-door sampling/sending samples for testing.

3. The testing cycle is short, the testing cost is low, and the experimental plan is more complete.

4. For initial inspection of samples, no testing fees will be charged during the initial inspection.

5. The test report supports scanning the QR code to check the authenticity.

BAIJIAN testing process

1. Send samples. (Communicate with engineers, submit your own testing requirements and send samples to our research institute)

2. Initial inspection samples. (After receiving the sample, conduct a preliminary inspection of the sample and formulate a detailed experimental plan)

3. Quotation. (After the initial inspection, a quotation will be made based on the customer's testing needs and the complexity of the experiment)

4. Both parties confirm, sign a confidentiality agreement, and start the experiment.

5. It takes 7-15 working days to complete the experiment.

6. Mail the test report and provide post-service.

The above is the relevant introduction to the correction coefficient test. If you have other needs, you can consult the laboratory engineer to help you solve it.

Previous post:Heat consumption test Next chapter:


TEL:400-101-7153       EMAIL:service@Baijiantest.com      ADD:No. 700, Yishan Road, Xuhui District, Shanghai

Copyright © 2021-2022 Shanghai Baijian Co., Ltd. All Rights Reserved.   www.zhijiantest.com   BAIJIAN sitemap


seo seo